
Job Location: Victoria Quay, Gosport
Description: We recently installed 22m long 508tubes and precast RC sections to form a new boat hoist dock. Part of the dock on the land side was sitting on CFA piles. All plant and equipment was our own.

Job Location: Victoria Quay, Gosport
Description: We recently installed 22m long 508tubes and precast RC sections to form a new boat hoist dock. Part of the dock on the land side was sitting on CFA piles. All plant and equipment was our own.